logo

Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability

Detalhes do produto:
Lugar de origem: China (continente)
Marca: YT
Certificação: ISO9001
Número do modelo: EX750-5
Condições de Pagamento e Envio:
Quantidade de ordem mínima: 1pcs
Preço: negotiable
Detalhes da embalagem: Embalagem de exportação padrão
Tempo de entrega: 7-30 dias
Termos de pagamento: L/c, t/t
Habilidade da fonte: 10000 PCs/mês

Informação detalhada

Modelo no.: EX750-5 Certificação: ISO9001
Nome do produto: Roda ininterrupta ou ininterrupta Terminar: Suave
Profundidade de dureza: 8-12mm Origem: CHINA
Processo: Forjando/fundindo Disponibilidade: 10-15 dias
Destacar:

8-12mm Hardness Depth Front Idler Assembly

,

EX750-5 Front Idler Assembly

,

10-15 Days Availability Front Idler Assembly

Descrição de produto

Hitachi EX750-5 Construction Machinery Bulldozer Heavy Duty Undercarriage Spare Parts Heat Treatment Front Idler Assembly

The Hitachi EX750-5 Front Idler Assembly is engineered for superior durability and performance in heavy-duty construction and mining applications. This precision-manufactured component ensures extended service life and reduced maintenance requirements.

What is an Idler?

The CHT idler combines advanced design with precision manufacturing for exceptional durability and safety. Key features include:

  • Idler-axle keyed joint expands bearing surface and enhances torque transmission
  • Specialized heat treatment achieves HRC48-58 surface hardness with 4-6mm hardened layer
  • Manufactured through alkali phenolic resin sand casting for robust, stable parts
  • Final refinement on CK5110 large-scale precision CNC vertical lathe ensures exact dimensions
  • Extended track life reduces replacement frequency and maintenance safety risks
Idler Characteristics
Tech-Driven Durability: Built to Outlast

50% reduced bearing pressure extends component life by 2x or more. The splined idler-shaft connection ensures reliability while aligning with other undercarriage parts to prevent uneven wear. Heavy-duty rock guard protects against dirt and debris.

Efficiency-Focused Design: Minimize Downtime, Maximize Output

Detachable bushed bearing blocks enable 40% faster maintenance without track disassembly. Dedicated lubricators prevent friction failures, while expanded bearing surfaces boost track stability in rough conditions.

Cost-Smart Engineering: Lower TCO, Higher Returns

Reduces unplanned stoppages and extends track system service life, significantly lowering overall operational costs through decreased downtime and part replacements.

Design/Structure/Main Dimensions of Installation
Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability 0 Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability 1 Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability 2
Production Processes
Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability 3
Hot Sale Products
Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability 4 Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability 5
Our Advantages
  • World-class quality standards
  • Factory-direct pricing
  • 35 years of excavator & bulldozer parts manufacturing experience
  • Fast 30-day delivery after contract
  • Professional sales and logistics support
  • Comprehensive after-sales services including 24/7 technical support

YinTai Parts is a leading Chinese manufacturer of excavator idlers with over 30 years of industry expertise. We guarantee the highest quality and performance for all our undercarriage components.

Entre em contato conosco

Incorpore sua mensagem

Você pode estar nesses